This was a significantly challenging build due to the age of the original property and the inherent weaknesses within it, but approached in a careful manner our team took down the existing conservatory and opened up most of the existing rear wall, without cracking a single tile in the recently refurbished bathroom directly above the new openings.
Our team carried out internal alterations including installation of a Bespoke 3 Lift Oak Stair Case, formation of a new snug area and a boot room and ground floor WC.